Weight/40HC: Avg 24-26MT. Can be as heavy as 28MT.
Quantity: 2 loads/week
Both rolls and bales are unused. The material we get in is about 50/50 betwe ...
Read moreWeight/40HC: Avg 24-26MT. Can be as heavy as 28MT.
Quantity: 2 loads/week
Both rolls and bales are unused. The material we get in is about 50/50 between rolls and bales. The material does not sit long, so both rolls and baled are preferred to be loaded together.
Inquire for more details.
Show less